Corporate environmental protection principles

To ensure that our environmental protection standards are safeguarded and continuously optimized, the following principles have been established in our corporate guidelines:

  • To ensure that our environmental protection standards are safeguarded and continuously optimized, the following principles have been established in our corporate guidelines:
  • The continuous improvement of water conservation, soil conservation and emission control are a key aim of environmental protection.
  • For reasons of accountability. environmental and climate protection should be developed in such a way as to preserve natural resources and avoid or minimize strains on the environment and our employees.
  • Issues of environmental protection should be taken into account equally in the planning and development of new products and production processes.
  • Processed raw materials and intermediate products should be brought into the economic cycle as completely as possible and unavoidable waste should be properly recycled or harmlessly disposed of. Raw material suppliers are advised on issues related to environmental protection 1f needed.
  • Essential precautions to avoid accidents and operational disruptions are in place to prevent or minimize environmental hazards for our employees and neighbours as well as effects on the environment.
  • Our employees’ sense of responsibility in environmental protection should be strengthened and an objective. open and respectful dialogue should take place with them. the relevant authorities and the public.
  • Our customers are appropriately informed about the features of our products and necessary safety measures and are advised on questions related to product disposal.
  • External companies working for us must be selected. informed and advised in such a way as to ensure that laws and our environmental protection standards are observed.
Measure
Degree of implementation/Date/Next steps
Status

Remediation of the current fayalite landfill (Phase III) after it’s decommissioning in November 2018

· Construction permit expected by Q2 2019

 · Final (completion of remediation) Commissioning expected by the end of 2020

In process of implementation (construction)

Reduction of dust emissions from the concentrate transfer by air-lift

· Investigation on optimization possibilities ongoing

· Implementation works to be executed during the next major smelter repair (Q2 2019)

In process of implementation

Reduction of emissions of unsuspended solids from the industrial waste water treatment plant

Installation of a new sand filter at the existing  industrial waste water treatment plant

 · Construction permit expected by October 2018

· Final commissioning expected by end 2019

In process of implementation (construction)

Prevention of the diffuse emissions from converter slag cooling 

Construction of a new installation. Converter slag cooling will take place in pots

 · Construction permit received in February 2018

· Final commissioning expected by the end of 2019